Director, Oztec Manufacturing
Director, Oztec Manufacturing
Over the last 12 months, the workload from Easternwell (for the Shell QGC project) on top of our normal workload, we’ve increased from 12 to 18, which is a big, big jump for us and it’s ongoing.
Do you like this page?